@inproceedings{4c0f91b3d04f4f508aa6abc97c42683a,
title = "Non-linear optimization of critical path method",
abstract = "Time and Cost Optimization (TCO) may be described as a process to identify appropriate construction activities to get the minimum duration of process and minimum additional cost which are needed. Critical Path Method (CPM) crashing project is one of methods to solve the time and cost optimization. But CPM crashing project needs some data to speed up the process business and in reality there are a lot of data which are represented using double timestamp event log. Therefore this paper represents a method to get data which are used in the crashing project. The data are obtained from average execution of activity duration in each case of event log. Then, to do the crashing project, this paper uses non-linear modeling to get minimum activity duration and minimum additional cost.",
keywords = "CPM crashing project, double timestamp event log, non-linear modeling, time and cost optimization",
author = "Effendi, {Yutika Amelia} and Riyanarto Sarno",
note = "Publisher Copyright: {\textcopyright} 2017 IEEE.; 3rd International Conference on Science in Information Technology, ICSITech 2017 ; Conference date: 25-10-2017 Through 26-10-2017",
year = "2017",
month = jul,
day = "1",
doi = "10.1109/ICSITech.2017.8257091",
language = "English",
series = "Proceeding - 2017 3rd International Conference on Science in Information Technology: Theory and Application of IT for Education, Industry and Society in Big Data Era, ICSITech 2017",
publisher = "Institute of Electrical and Electronics Engineers Inc.",
pages = "90--96",
editor = "Riza, {Lala Septem} and Andri Pranolo and Wibawa, {Aji Prasetyo} and Enjun Junaeti and Yaya Wihardi and Hashim, {Ummi Raba'ah} and Shi-Jinn Horng and Rafal Drezewski and Lim, {Heui Seok} and Goutam Chakraborty and Leonel Hernandez and Shah Nazir",
booktitle = "Proceeding - 2017 3rd International Conference on Science in Information Technology",
address = "United States",
}